Skip to main content
Run of Show replaces the older day-of timeline. New organizations start on Run of Show and never see the timeline. Organizations that used the timeline move over once, when an owner or admin switches.

The day-of timeline

The day-of timeline is a lighter Timeline section on a gig’s Overview tab: a simple list of day-of segments, each with a name, a start and end time, and notes.
Add items, drag to reorder, and edit inline. It’s the quick option when you just need load-in through load-out, without sections, tracks, people or songs.

Living with both

  • On the web, an organization that has Run of Show but hasn’t switched yet can see both on a gig that still has timeline items, with a note to editors that the two can show different times.
  • Once a gig has a run of show, the empty Timeline section no longer appears.
  • The mobile app shows one plan per gig: Run of Show when it’s on for that gig, otherwise the timeline.

Switching from the timeline

An organization owner or admin makes the switch once, for the whole organization, from Settings → Organization → Gig workflow → Switch to Run of Show. The card appears once Run of Show is turned on for your organization. Until the switch, owners and admins also see a Switch to Run of Show notice above a gig’s older timeline. Review the switch opens the card, and dismissing the notice hides it for you.

Before you confirm: the preview

The card previews what the switch will copy:
  • how many timeline items will be copied
  • how many gig setlists, with their sets and songs
  • how many library setlists become templates
  • anything that needs a look first
Limits. A run of show holds up to 500 items and 100 sections. If a gig would go over, or a library setlist has so many sets that its template would, the card names it. You can’t confirm until you trim that gig’s timeline or setlists, or split that library setlist. Nothing is copied until everything fits. Long sets. A set with more than 100 songs is split into consecutive sets of up to 100 songs, titled “(1 of 2)”, “(2 of 2)” and so on, with its songs in order. Each copied set takes its length from its songs, so the length stays right when you add or remove songs later.

What happens when you confirm

  • Every gig’s timeline is copied into its Run of Show, past gigs included. The items land in a section named Timeline, one per gig day, after anything the run of show already had, such as sections from your default template. Times, end times and notes carry over. An item that ran past midnight stays with the show day it belonged to.
  • Every setlist is copied too. A gig’s setlist becomes a section of its Run of Show, named after the setlist and placed after the existing sections on the first day. Each set becomes one song item in that section, with the set’s songs in order, its notes, and its running time when it had one. Sets carry no start time, so slot them into the night yourself. A setlist from your library, one not attached to a gig, becomes a Run of Show template with one section of sets.
  • Setlists become read-only. You edit sets in the gig’s Run of Show, in its List or Schedule view. The separate Setlists pages, the gig’s old Setlist section and the mobile Setlist tab go away. Songs still live in Documents → Songs. See Setlists after the switch.
  • The Timeline section goes away on web and mobile for everyone in the organization. Crew still see the gig’s schedule: call sheets, day sheets, advance packets and the crew schedule on mobile now read from Run of Show.
  • Imports keep working. Schedule rows pulled from an uploaded file or connected source land in the gig’s Run of Show.
  • Everyone on the gig can read the Run of Show, including invited crew who aren’t members of your organization, the same people who could read the timeline. Editing still needs the gig lead or the Run of Show role.
The switch is one-way. There’s no button to go back to the timeline or to separate setlists. The original timeline entries and setlists are kept on our side, so contact support if something didn’t copy the way you expected.

After the switch

Move, rename or delete the copied items like any other run of show item. A deleted item stays deleted: running the switch again, or importing into a gig later, never brings back an item you removed. A good first pass on an upcoming gig:
  1. Open its Run of Show tab.
  2. Find the Timeline section and drag its items into proper sections, such as Load in, Show, Load out.
  3. Drag the copied sets into place and give them start times.
  4. Link back-to-back items. See Linking and timing.
  5. Publish. See Publishing.

Bringing setlists over after an earlier switch

Organizations that switched to Run of Show before setlists moved over keep their separate setlists until an owner or admin brings them in. Switching again doesn’t bring them over. The same card shows Bring setlists into Run of Show with its own preview. Confirming copies every gig setlist and library setlist exactly as described above, and then setlists become read-only. It runs once. A setlist that was already copied is never copied again. Setlists imported from a file later still work: they’re copied into a Run of Show template as they arrive.

Templates

Library setlists become templates.

Setlists

Working with sets after the switch.