# Building on the Schedule

> Lay out a gig day directly on a timeline: add items at a time, drag and resize bars, build act lanes and sets, and edit details in the side sheet.

The **Schedule** view lets you build the day where you can see it: on a timeline, by track and by time. It's the fastest way to lay out a production day with several teams, or a wedding with several acts, because you place each item where it belongs instead of typing times into rows.

![Schedule view in the Tracks layout with a Schedule lane and a Performance lane, key time lines and the sets](https://mintcdn.com/soundchecklive/DQsOfwUk5leizXB5/images/run-of-show/schedule-tracks-light.png?fit=max\&auto=format\&n=DQsOfwUk5leizXB5\&q=85\&s=dfccd817cb7b006bb37da14a6798f4ae)

Everything you do here is the same run of show you see in **List** and **Setlist**. Edits snap to 15 minutes and [autosave](https://docs.soundchecklive.io/features/gigs/run-of-show/publishing-and-collaboration.md) like the rest of Run of Show. **Undo** and **Redo** sit next to the save status.

Choose the layout with **Schedule direction**: **Tracks** or **Horizontal**. To read the layouts rather than edit them, see [Views and filters](https://docs.soundchecklive.io/features/gigs/run-of-show/views.md#schedule).

## Before you start

* **Give sections a track.** The Schedule arranges the day by track (**Production**, **Performance**, **Vendors**, **Hospitality** and so on). Sections without a track share one **Schedule** row or lane.
* **Add the acts to the gig.** Each act on the gig gets its own lane on **Tracks**, which is where sets live.
* **Set the gig's date.** Times are placed on the gig's days. Without a date there's nothing to place them on.

## Editing on the Tracks layout

**Tracks** shows times down the side and one lane per track and per act across.

### Add an item at a time

**1. Find the time and lane**

Hover an empty cell in a timed row, or focus it with the keyboard.

**2. Add it**

Choose **Add item**. The new item starts at that row's time in that lane.

**3. Fill it in**

The item opens in the side sheet. Name it and add its details.

On an act or track lane with no items yet, the new item starts a new section for that lane.

### Add a section

Choose **+** (**Add section**) at the end of the lane headers and pick a track.

The track list is fixed: **Production**, **Performance**, **Vendors**, **Hospitality**, **Front of house**, **Security**, **Travel**, **Ceremony & program**, and **Guests**. You can't add a track or rename one. For a lane with its own name, such as a DJ or a second band, pick the act on the item instead: each act on the gig gets its own lane. See [Act lanes](#act-lanes).

### Act lanes

An item sits in an act's lane when:

* the act is picked on the item, or
* the item or its section has a lineup label that matches the act's name.

A label that matches no act gets a lane of its own, marked **Not an act yet**. Open the lane's menu and choose **Save as an act** to create the act and link its items. Everything else sits in its section's track, or in **Schedule** when the section has no track.

Under each lane:

* **Add set** adds an empty set after the lane's last item.
* **Add item** adds an item after the lane's last item.

Open a set to work with its songs:

* Add songs. The act's songs come first, then the rest of the library.
* Drag a song to reorder it.
* Remove a song.

Each song has a menu:

* **Add a moment after this song** splits the set at that song, for a first dance or a toast in the middle of a set. The songs before stay in the set. The moment becomes its own item with its own time. The songs after continue in a second set marked **(cont.)**.
* Move the song to another set.

An act lane's menu can also add one of your saved setlists to that lane as sets. Each set in the setlist becomes a set item in the lane.

> [!TIP]
>
> A wedding band playing a cocktail set and two dance sets gets one lane. Add the three sets with **Add set**, fill them from the act's songs, and use **Add a moment after this song** where the first dance lands. The **Setlist** view and the **List** view show the same sets.

## Editing on the Horizontal layout

**Horizontal** shows items as bars on a time grid.

| To… | Do this |
| - | - |
| Add an item | Click or drag across empty time, or choose **Add item**. A new item doesn't move the items already there. |
| Change its length | Drag the right edge of a bar. Everything later that gig day moves by the same amount, across sections and including fixed times. Shortening an item pulls later items earlier. |
| Move it | Drag the bar. It gets a fixed start time. |
| Edit its details | Click the bar to open it in the side sheet. |
| Add a section | Choose **Add section** at the bottom of the **Who** column, under the last row. On an empty schedule it sits under the empty message. It offers the tracks suggested for your business type first. |

> [!WARNING]
>
> Resizing ripples. Lengthening the 6 PM cocktail hour by 30 minutes pushes every later item that day 30 minutes later, including items with a fixed time. If you only want to change one item, set its length in the side sheet instead, or use [Shift this and later](https://docs.soundchecklive.io/features/gigs/run-of-show/linking-and-timing.md) deliberately.

### Dragging and links

If items are [linked](https://docs.soundchecklive.io/features/gigs/run-of-show/linking-and-timing.md), dragging one bar to another section or track breaks its links instead of moving the whole chain.

## The side sheet

Click an item on either layout to open it in the side sheet. From there you can set:

* **Title**. Turn on **Song set** to make the item a set of songs. Press **Enter** in the title to add the next item.
* **Start** and **Length**. An item without a start time follows the previous item.
* **Notes** and cue details such as timing, playback and speakers.
* **Key time**, to make the item one of the gig's key times. See [Key times in the run of show](https://docs.soundchecklive.io/features/gigs/run-of-show/key-times.md).
* **People**. See [People and assignments](https://docs.soundchecklive.io/features/gigs/run-of-show/people-and-assignments.md).
* On a song item, the set's songs: add, remove and reorder them in the sheet, or choose **Use a saved setlist** to fill the item from a setlist in your library. See [Setlists](https://docs.soundchecklive.io/features/gigs/run-of-show/setlists.md).

Choose **Delete item** to remove it. Files are edited in the **List** view, so choose **Open in list** for those.

Click a section to open its side sheet. It holds the section's **Title**, **Time**, link to a key time, **Track**, track crew, **Notes** and location.

> [!NOTE]
>
> The side sheets no longer have a **Color** field or a **Who sees it** field. A section's colour comes from its [key time](https://docs.soundchecklive.io/features/gigs/run-of-show/key-times.md), or from its position when it has none. Who sees an item comes from its [assignments](https://docs.soundchecklive.io/features/gigs/run-of-show/people-and-assignments.md).

## Shortcuts

| Shortcut | Does |
| - | - |
| Cmd/Ctrl+Z | Undo |
| Cmd/Ctrl+Shift+Z or Cmd/Ctrl+Y | Redo |
| Cmd/Ctrl+D | Duplicate the selected item |
| Delete or Backspace | Remove the selected item |
| Left or right arrow | Nudge the selected item by 5 minutes |
| Shift + left or right arrow | Nudge it by 15 minutes |
| Esc | Deselect |

## Worked example: a production day

**1. Lay out the tracks**

Choose **Add section** and add a **Production** section and a **Performance** section.

**2. Block the production day**

On **Horizontal**, drag across 12 PM to 3 PM in the Production row for *Load in*, then 3 PM to 4:30 PM for *Line check*.

**3. Mark the key moments**

Open *Load in* in the side sheet and pick **Load in** under **Key time**. Its row takes the Load in colour, and the gig's Load in time follows the item when you move it.

**4. Add the show**

In the Performance row, add *Doors* at 7 PM and the band's sets after it. Switch to **Tracks** to see both teams side by side.

**5. Absorb a delay**

The truck is late. Drag the right edge of *Load in* 30 minutes later. Everything after it that day moves with it.

## Related

> [card] [Views and filters](https://docs.soundchecklive.io/features/gigs/run-of-show/views.md)
>
> How to read each view.

> [card] [Linking and timing](https://docs.soundchecklive.io/features/gigs/run-of-show/linking-and-timing.md)
>
> Segues, groups and shifting times.

> [card] [Setlists](https://docs.soundchecklive.io/features/gigs/run-of-show/setlists.md)
>
> Sets inside the run of show.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.